Mine Tailings Backfill Station

Short Description

Brand: RUICHUAN
Product Origin: Shandong, China
Categories: Mine Backfill Systems
Application: Preparation, classification, mixing, and pipeline delivery of tailings backfill slurry for underground void filling and mine backfilling operations
Product Type: Tailings backfill station

Back to Products
Product Detail

描述

Overview

The Mine Tailings Backfill Station is designed for underground mine backfilling by preparing, classifying, proportioning, mixing, and transporting tailings slurry to underground stopes or mined-out areas. It is an integrated filling system used to support surrounding rock, control ground pressure, reduce surface subsidence, and improve solid waste utilization in modern green mining operations.

The system uses final tailings from the mineral processing plant as the main filling material. Tailings are concentrated, classified, mixed with binder materials and supplementary water, then delivered through pipelines for underground backfilling. This process helps extend tailings storage facility service life, reduces environmental discharge, and supports safer and more efficient mining.

Applications

  • Underground mine void filling
  • Stope backfilling in metal mines
  • Deep mining operations requiring ground pressure control
  • Mining under buildings, water bodies, and railways
  • Mines with strict subsidence control requirements
  • Sites requiring underground disposal of tailings and solid waste
  • Backfill systems for environmentally sensitive mining areas

Suitable Materials and Working Conditions Include

  • Tailings from mineral processing plants
  • Classified coarse tailings sand for mine filling
  • Binder materials used in cemented tailings backfill
  • Paste backfill slurry systems
  • Supplementary process water for slurry preparation
  • Continuous mine filling operations with pipeline transport
  • Applications requiring high solids concentration and controlled setting performance

Technical Characteristics

  • Integrated tailings concentration, classification, proportioning, mixing, and delivery process
  • Supports underground disposal and reuse of mine tailings
  • Overflow water can be returned to the water pool for reuse
  • Hydrocyclone classification separates coarse particles for backfill use
  • Continuous weighing and dosing of different materials according to process ratio
  • High-density twin-shaft mixing for uniform slurry preparation
  • Secondary vertical mixing for improved slurry consistency
  • Buffer filtration and pipeline transport for stable underground filling
  • Suitable for cemented tailings backfill and paste backfill processes
  • Helps reduce environmental discharge and improve tailings utilization efficiency

Optional Configuration / Notes

  • System configuration should be selected according to required filling capacity, slurry type, mine layout, and tailings characteristics.
  • Cemented tailings backfill and paste backfill process routes can be configured according to project requirements.
  • The final equipment list, pipeline arrangement, and control scope should be confirmed according to the site layout and required automation level.
  • The source information includes one pumping-related parameter with inconsistent unit expression and it should be confirmed before final publication.
  • Detailed engineering design, layout drawing, and equipment sizing are available upon request.

Technical Parameters And Main Performance Indicators

Main Process Flow

Step Description
1 Tailings enter the vertical mixing tank and hydrocyclone group
2 Supplementary water is added according to process requirement
3 Stored dry materials are conveyed by screw conveyor to screw quantitative feeder
4 Different materials are weighed and proportioned according to the required ratio
5 Classified tailings slurry and proportioned dry materials enter the high-density twin-shaft mixer
6 Mixed slurry flows to the vertical mixing tank for secondary agitation
7 The slurry enters the buffer filtration tank for stabilization and separation
8 Qualified slurry is transported underground through pipelines for backfilling

Main Equipment

No. Equipment Function
1 Storage Silo Stores dry auxiliary filling materials
2 Tailings Mixing Tank Receives and conditions incoming tailings slurry
3 Hydrocyclone Group Classifies tailings and separates coarse fraction for backfill use
4 Double-Pipe Overflow Screw Conveyor Transfers material within the backfill preparation line
5 Screw Quantitative Feeder Weighs and meters dry materials according to the process ratio
6 High-Density Twin-Shaft Mixer Continuously mixes tailings slurry, dry materials, and water
7 Buffer Filtration Tank Provides buffering, filtration, and stabilization before pipeline transport
8 Auxiliary System Includes transfer pipelines, pumps, water supply pipelines, and control system

Main Technical Parameters

Item Specification
Backfill Slurry Mass Concentration Cemented tailings backfill 64 to 68%; paste backfill 72 to 78%
Binder-Sand Ratio One-step process 3:1 to 4:1; two-step process 6:1 to 10:1
Binder Dosage 8 to 20%
Maximum Aggregate Size Not more than 5 mm, with at least 90% passing
Paste Slump 180 to 230 mm
Bleeding Rate Not more than 3%
Initial Setting Time 4 to 8 h
Final Setting Time 12 to 24 h
Self-Flow Velocity 1.5 to 3.0 m/s
Working Pressure 2 to 8 MPa
Backfill Capacity 30 to 120 m3/h
Layer Height 2.5 to 3.5 m
Curing Time Before Mining Resumes At least 72 h
Design Standard GB/T 51450-2022 Mine Backfill Design Standard